Tonight’s work included locating and wiring the limit switch. Strengthening the elevator structure, finishing the flappers and designing the protective cone for intake motor
Finding a location for the bottom limit switch
Gabriel working with Mr Derry and Mrs DiCarlo on the limit switch
Allison measuring!
Jared working on finishing the ends of the elevator structural reinforcing arms
RJ in his favorite helmet
Avery and Tom work in Solidworks to design the “Cone”
David deburrs a wire clamp that he has previously milled
David deburrs a wire clamp that he has previously milled
Jared and RJ work on the elevator
Gabrielle and Nate work on wires for the limit switch
Shannon working on the parts list
Max fixes springs to the flappers
Like this:
Like Loading...
Related